Overhead Crane 30 Ton
video

Overhead Crane 30 Ton

The 30-ton double-girder bridge crane is a heavy-duty lifting equipment with superior performance and multi-faceted protection system. It generally adopts honeycomb beam design, which makes the crane light in weight, large in load and extremely strong in wind resistance.
Send Inquiry
Product Introduction

 

The Overhead Crane 30 Ton is a heavy-duty lifting equipment with superior performance and multi-faceted protection system. It generally adopts honeycomb beam design, which makes the crane light in weight, large in load and extremely strong in wind resistance. This kind of crane generally uses steel pin connection, which is not only strong and reliable, but also greatly shortens the splicing time.It covers a wide range of different lifting weight levels to ensure that different usage needs are met. In short, this Overhead Crane 30 Ton has superior structural design, complete safety protection measures, and its main parameters can cover a wide range of industrial applications, ensuring the safety of the operation process.

product-600-500

Warranty:1 year

Weight (KG):10000kg

Feature:Bridge Crane

Condition:New

Color:Clients' Requirments

 

Pictures & Components

 

Bridge: The bridge is the most basic structure of the crane, mainly composed of two parallel main beams and multiple secondary beams. The main beam is generally made of welded steel plates or profiled steel composite beams, which have high stiffness and strength and can ensure the stability of the crane during operation.

product-1482-1111

Trolley: The trolley is located under the bridge and moves along the bridge track. Its main function is to lift and move goods laterally. It usually includes a lifting mechanism and a traversing mechanism, which uses electric motors and rollers to lift or lower goods.

product-500-375

Operating room: The operating room is where the operator controls the crane. Depending on the working environment, the operating room can be divided into three types: open, closed and insulated room, and has different types of platform entrances to adapt to different working environments and operating habits.

product-225-225

Crane operating mechanism: The cart operating mechanism is responsible for the horizontal movement of the entire crane on the track, and is usually composed of a motor, reducer, wheels and brakes. Driven by the electric motor, the reducer transmits power to the wheels, thereby realizing the lateral movement of the crane.

product-682-512

Sketch:

product-720-575

product-600-500

 

Main technical data

 

product-748-397

product-600-500

 

Advantages

 

product-600-500

Diversified operating room: The diverse design of the operating room meets the needs of different working environments. Three types are available: open, closed and thermal insulation, providing operators with a suitable working environment and better vision.

Efficient mobility: Overhead Crane 30 Tons adopt aerial operation, which has higher operating efficiency and mobility compared with ground-operated cranes. The dry operation mode can provide more precise control, thus speeding up the work process and improving production efficiency.

Comprehensive technical parameters: The main technical parameters cover various aspects such as lifting capacity, span and lifting height, meeting different lifting needs, expanding the scope of use and improving operating efficiency.

Low installed capacity: The minimum installed capacity design effectively solves the problem of electricity consumption in field construction, reduces energy consumption, and improves the applicability of the equipment in power shortage environments.

Convenient adjustment: After the trolley passes the trial run inspection at the manufacturer, it can be directly installed on the bridge with only minor adjustments, simplifying the installation process and saving time.

 

Application:

 

Material handling: As heavy lifting equipment, the Overhead Crane 30 Ton plays a pivotal role in various industrial productions. Whether it is the steel industry, automobile manufacturing, machining or other heavy industrial fields, it is one of the essential equipment. Its powerful lifting capacity and flexible maneuverability make it an ideal choice for handling heavy objects such as large parts, molds, raw materials, etc.

Equipment installation: During the installation and maintenance of large equipment, the 30-ton double-girder overhead crane also plays a key role. Overhead Crane 30 Tons can provide smooth and precise handling services, ensuring the accuracy and safety of equipment installation.

Port logistics: Ports are another important application scenario for Overhead Crane 30 Tons. Here, cranes are used for loading and unloading cargo, including the handling and stacking of containers. Its sturdy structure and stable performance enable it to adapt to the open and continuous operating environment of the port.

Construction: In the field of construction, the application of 30-ton double-girder overhead crane is also significant. It is often used for handling large building materials, such as prefabricated components, large steel structures, etc. Cranes can be quickly deployed at the construction site, improving construction efficiency and shortening the construction cycle.

 

Global market

 

product-554-438

 

Crane production procedure

 

product-1200-824

 

Workshop view

 

Material Inspection

Quality Inspection: Strict quality inspection is carried out on the purchased raw materials to ensure that they meet the design requirements and national standards.

Material Storage: Qualified materials are stored according to classification to prevent corrosion or damage.

Cutting and Forming

Steel Cutting: Use plasma cutting, laser cutting or flame cutting and other technologies to cut the steel according to the size of the design drawing.

Forming Processing: Form the steel plate through bending, rolling, welding and other processes to manufacture the main beam, end beam and other structural parts.

Welding

Component Welding: The cut and formed steel parts are welded into the main structures such as the main beam, end beam and trolley. The welding process needs to be strictly controlled to ensure the structural strength and welding quality.

Weld Inspection: Use non-destructive testing technology (such as ultrasonic testing, radiographic testing) to inspect the welds to ensure that there are no cracks or other defects.

Machining

Precision Machining: Precision machining is performed on the key components of the crane, such as wheel sets, bearing seats, pulleys, etc., to ensure their dimensional accuracy and surface quality.

Assembly of the whole machine

General assembly: On the basis of pre-assembly, the overall assembly of the crane is carried out, including the final installation of the main beam, end beam, lifting mechanism, walking mechanism, etc.

Commissioning and testing

Under dynamic conditions, the operating performance of the crane is tested, including the testing of lifting, walking, steering and other functions. The overall size of the assembled bridge crane is checked to ensure that all dimensions meet the design requirements.

Spraying and anti-corrosion treatment

Surface treatment Rust removal: Rust removal on the surface of the crane, common methods include sandblasting, pickling, etc. Primer spraying: Spray anti-corrosion primer on the treated surface to prevent metal oxidation and corrosion. Topcoat spraying Color spraying: Spray topcoat according to customer requirements or industry standards to give the crane a protective and decorative effect. Marking: After spraying, mark the crane's identification information in accordance with the specifications, such as model, rated load, etc.

Factory and installation

Packaging and transportation

Packaging protection: Protectively package the key components of the crane to prevent damage during transportation. Transportation arrangement: According to the equipment size and transportation conditions, select a suitable transportation method to transport the crane to the customer's site.

Acceptance and delivery

Customer acceptance

On-site acceptance: The customer conducts on-site acceptance of the crane according to the contract requirements and technical specifications to check the performance and quality of the equipment.

Problem rectification: If any problems are found, the manufacturer needs to rectify them in time to ensure that the equipment fully meets the customer's requirements. Delivery and use Operation training: The manufacturer usually trains the customer's operators to ensure that they can operate the crane correctly and safely.

product-1200-610

product-1099-514

product-1695-676

product-1599-669

product-1269-715

Hot Tags: overhead crane 30 ton, China overhead crane 30 ton manufacturers, suppliers, factory

Send Inquiry

whatsapp

Phone

E-mail

Inquiry