20 Ton Electric Single Girder Overhead Crane For Indoor Workshop
Products Description
A 20 Ton Electric Single Girder Overhead Crane is a highly efficient material handling solution designed for indoor workshops, warehouses, fabrication plants, maintenance facilities, and manufacturing workshops. The crane consists of a single box-type main girder equipped with an electric wire rope hoist that travels along the girder, enabling safe and precise lifting and transportation of heavy loads up to 20 tons. Single girder overhead cranes are widely recognized for their compact structure, cost-effectiveness, easy installation, and low maintenance requirements.
Lifting Capacity 1 – 20 tons (custom up to 50+ tons)
Span 5 – 30 meters
Lifting Height 3 – 30 meters
Lifting Speed 1 – 20 m/min (adjustable)
Trolley Speed 5 – 30 m/min
Crane Travel Speed 10 – 60 m/min
Power Supply 380V/415V, 50Hz (3-phase)
Duty Class FEM A3-A5 (Medium to Heavy Duty)

Pictures & Components
1. Main Girder
The primary load-bearing structure of the crane.
Usually fabricated as a welded box girder from high-strength steel plates.
Supports the hoist and transfers the load to the end carriages.
Designed to minimize deflection while maintaining a lightweight structure.

2. End Carriages (End Trucks)
Installed at both ends of the main girder.
Equipped with wheels that travel on the runway rails.
Support the bridge structure and provide crane traveling motion.
![]() |
![]() |
3. Electric Wire Rope Hoist
The core lifting unit consisting of:
Lifting motor
Gear reducer
Wire rope drum
Steel wire rope
Hook block
Electromagnetic brake
Functions:
Lifting and lowering loads up to 20 tons.
Moving along the main girder for cross-travel operation.
![]() |
![]() |
4. Hoist Traveling Mechanism
Travel motor
Drive wheels
Gear transmission system
Wheel brackets
Function:
Moves the hoist horizontally along the main girder.

5. Crane Traveling Mechanism
Crane travel motors
Gearboxes
Drive shafts (if applicable)
Travel wheels
Function:
Moves the entire crane bridge along the runway rails.

6. Hook Block Assembly
Forged crane hook
Pulley sheaves
Hook nut
Safety latch

7. Steel Wire Rope
High-strength galvanized or non-galvanized wire rope.
Wound around the hoist drum.
Transmits lifting force from the hoist to the hook block.
8. Electrical Control System
Includes:
Main electrical panel
Variable Frequency Drive (VFD) (optional)
Contactors and relays
Circuit breakers
Power distribution units
Function:
Controls lifting, cross travel, and long travel motions.
.
9. Power Supply System
Busbar system or festoon cable system.
Supplies electrical power to crane movements and hoist operations.
10. Control Devices
Pendant Control
Wired push-button station suspended from the crane.
Wireless Remote Control
Allows operators to control the crane remotely.


11. Runway Rail System
Rails mounted on workshop support beams.
Guides crane movement along the building length.
12. Safety Devices
Overload Limiter
Prevents lifting loads exceeding rated capacity.
Upper & Lower Limit Switches
Prevent over-hoisting and over-lowering.
Travel Limit Switches
Restrict crane and hoist travel within safe limits.
Emergency Stop Button
Instantly stops crane operation during emergencies.
Phase Protection Relay
Protects motors from phase loss or phase reversal.
Buffers
Installed at runway ends to absorb impact.
Rail Sweepers
Remove debris from crane travel paths.
Audible & Visual Alarm (Optional)
Warns personnel when the crane is operating.
Sketch

Main technical
Advantages
Advantages of a 20 Ton Electric Single Girder Overhead Crane for Indoor Workshops
1. Cost-Effective Solution
Lower manufacturing cost compared to double girder overhead cranes.
Reduced installation and maintenance expenses.
Excellent return on investment for medium-duty lifting applications.
2. High Working Efficiency
Enables quick lifting, lowering, and transportation of heavy materials.
Reduces manual handling and labor requirements.
Improves production flow and workshop productivity.
3. Space-Saving Design
Utilizes overhead space without occupying valuable floor area.
Allows unobstructed movement of personnel, vehicles, and equipment below.
Ideal for workshops with limited operating space.
4. Lightweight Structure
Single girder design has lower self-weight than double girder cranes.
Reduces load on building columns and runway beams.
Can lower workshop construction costs.
5. Smooth and Precise Operation
Equipped with electric wire rope hoists for stable lifting.
Variable Frequency Drive (VFD) control can provide smooth acceleration and deceleration.
Minimizes load swing and improves positioning accuracy.
6. Easy Installation
Modular design simplifies transportation and assembly.
Shorter installation and commissioning time.
Suitable for both new workshops and existing facilities.
7. Low Maintenance Requirements
Fewer structural and mechanical components.
Easy access to motors, brakes, and electrical systems.
Reduced downtime and maintenance costs.
8. Reliable Safety Performance
Equipped with multiple safety devices, including:
Overload protection
Emergency stop system
Upper and lower limit switches
Travel limit switches
Phase-loss protection
Buffers and rail sweepers
Ensures safe operation and protection of personnel and equipment.
9. Flexible Control Options
Pendant push-button control
Wireless remote control
Operator cabin control (optional)
Operators can choose the most suitable control method for their working environment.
10. Wide Application Range
Suitable for handling:
Steel structures
Machinery and equipment
Molds and dies
Fabricated components
Industrial materials
Warehouse cargo
11. Energy Efficient
Modern motors offer high efficiency and low power consumption.
Optional VFD systems help reduce energy usage and mechanical wear.
Supports environmentally friendly industrial operations.
12. Customizable Design
Can be customized according to project requirements:
Span length
Lifting height
Travel speed
Power supply
Duty classification
Control system
Special lifting attachments
13. Improved Workplace Safety
Reduces dependence on forklifts and manual lifting.
Minimizes risks associated with moving heavy loads.
Enhances overall workshop safety and operational control.
Summary
A 20 Ton Electric Single Girder Overhead Crane provides an ideal balance of lifting capacity, efficiency, safety, and economy. Its lightweight structure, low operating costs, reliable performance, and adaptability make it one of the most popular lifting solutions for indoor workshops, manufacturing plants, warehouses, and maintenance facilities requiring medium-duty material handling.
Application
A 20 Ton Electric Single Girder Overhead Crane is widely used for lifting, transporting, loading, unloading, and positioning heavy materials and equipment within indoor industrial facilities. Its efficient operation and cost-effective design make it suitable for a variety of medium-duty applications.
1. Manufacturing Workshops
Handling raw materials and finished products.
Moving machine components between production stations.
Supporting assembly line operations.
Loading and unloading heavy equipment.
2. Steel Fabrication Plants
Lifting steel plates, beams, pipes, and structural components.
Transporting fabricated steel structures for welding and assembly.
Assisting in cutting, machining, and finishing operations.
3. Machinery Manufacturing Facilities
Handling large machine parts and assemblies.
Positioning components during manufacturing and testing.
Loading finished machinery for shipment.
4. Equipment Maintenance Workshops
Removing and installing motors, pumps, gearboxes, and heavy machinery.
Supporting repair and overhaul activities.
Facilitating equipment inspection and maintenance.
5. Warehouses and Distribution Centers
Loading and unloading heavy cargo.
Moving palletized materials and industrial goods.
Improving storage and retrieval efficiency.
6. Mold and Die Manufacturing Plants
Handling heavy molds and dies.
Transporting tooling between machining, assembly, and storage areas.
Assisting with mold installation and replacement.
7. Power Equipment Manufacturing
Lifting generators, transformers, switchgear, and electrical equipment.
Supporting assembly and testing processes.
Handling large fabricated components safely.
8. Construction Material Factories
Transporting concrete products, steel reinforcements, and building materials.
Supporting production and storage operations.
Loading products for transportation.
9. Automotive and Heavy Equipment Workshops
Moving engines, chassis components, and assemblies.
Assisting vehicle and equipment manufacturing processes.
Supporting maintenance and repair operations.
10. Paper, Textile, and General Industrial Plants
Handling production materials and equipment.
Supporting routine manufacturing operations.
Improving workflow efficiency and reducing manual labor.
Typical Materials Handled
Steel plates and structural steel
Machinery components
Fabricated metal products
Molds and dies
Industrial equipment
Mechanical assemblies
Construction materials
Heavy warehouse cargo
Pumps, motors, and gearboxes
Key Benefits in These Applications
Increased productivity and throughput.
Reduced manual handling and labor costs.
Improved workplace safety.
Efficient utilization of overhead space.
Accurate positioning of heavy loads.
Reliable operation for daily industrial use.
The 20 Ton Electric Single Girder Overhead Crane is particularly suitable for indoor facilities requiring frequent lifting operations, moderate duty cycles, and economical material handling solutions, making it a preferred choice across manufacturing, fabrication, maintenance, and warehousing industries.
Crane Production Procedure
20 Ton Electric Single Girder Overhead Crane Production Procedure
1. Engineering Design
Design Requirements Analysis
Confirm lifting capacity, span, lifting height, duty class, and workshop dimensions.
Determine hoist specifications and control methods.
Verify compliance with applicable standards and customer requirements.
Detailed Engineering Design
Main girder structural design.
End carriage design.
Hoist selection and configuration.
Electrical control system design.
Safety device arrangement.
Technical Documentation
General assembly drawings.
Fabrication drawings.
Electrical schematics.
Quality inspection plans.
2. Raw Material Procurement and Inspection
Material Procurement
Structural steel plates.
Steel sections and profiles.
Motors and gearboxes.
Electrical components.
Wire ropes and hooks.
Incoming Quality Inspection
Verify material certificates.
Check dimensions and specifications.
Inspect surface quality.
Conduct material testing when required.
3. Main Girder Fabrication
Steel Plate Cutting
CNC plasma or flame cutting according to fabrication drawings.
Edge preparation for welding.
Plate Forming
Web and flange plate bending.
Dimensional verification.
Girder Assembly
Position web and flange plates on assembly platform.
Install stiffeners and reinforcement plates.
Welding
Automatic submerged arc welding (SAW).
CO₂ gas shielded welding for auxiliary components.
Weld quality inspection.
Girder Straightening
Correct welding deformation.
Check camber and deflection requirements.
Dimensional Inspection
Span accuracy.
Diagonal measurements.
Girder alignment and straightness.
4. End Carriage Manufacturing
Component Cutting and Machining
End beam fabrication.
Wheel seat machining.
Bearing housing preparation.
Assembly
Install wheels, bearings, and drive shafts.
Mount travel motors and reducers.
Inspection
Wheel alignment check.
Dimensional verification.
Rotation testing.
5. Hoist Assembly
Mechanical Assembly
Drum installation.
Gearbox assembly.
Motor installation.
Brake installation.
Wire Rope Installation
Wire rope winding.
Rope fixing and tension adjustment.
Hook Block Assembly
Hook installation.
Pulley assembly.
Safety latch installation.
Functional Testing
Lifting operation test.
Brake performance verification.
6. Machining Process
Precision Machining
Wheel machining.
Shaft machining.
Coupling preparation.
Bearing seat finishing.
Quality Control
Dimensional measurement.
Surface finish inspection.
Tolerance verification.
7. Surface Preparation
Shot Blasting
Remove rust, scale, and contaminants.
Achieve required surface cleanliness grade.
Surface Inspection
Check cleanliness and roughness.
Verify preparation quality before painting.
8. Painting Process
Primer Coating
Apply anti-corrosion primer.
Intermediate Coating
Improve corrosion resistance and coating thickness.
Finish Coating
Apply customer-specified color.
Ensure uniform appearance and protection.
Drying and Curing
Allow sufficient curing time before assembly.
9. Electrical System Assembly
Control Panel Fabrication
Install contactors, breakers, relays, and protection devices.
Wire electrical circuits according to schematics.
Electrical Installation
Festoon cable system installation.
Limit switch installation.
Power supply system assembly.
Control Devices Installation
Pendant control station.
Wireless remote control system (if specified).
Warning alarms and indicator lights.
10. Complete Crane Assembly
Mechanical Assembly
Connect main girder and end carriages.
Install hoist on girder.
Assemble travel mechanisms.
Electrical Integration
Connect motors and control systems.
Install cable routing systems.
Verify grounding protection.
Safety Device Installation
Overload limiter.
Travel limit switches.
Emergency stop system.
Buffers and rail sweepers.
11. Quality Inspection
Structural Inspection
Weld quality examination.
Dimensional inspection.
Visual inspection.
Mechanical Inspection
Wheel alignment.
Gearbox operation.
Brake performance.
Electrical Inspection
Insulation resistance testing.
Circuit continuity verification.
Control function testing.
12. Factory Acceptance Testing (FAT)
No-Load Testing
Hoist operation.
Cross travel operation.
Long travel operation.
Static Load Test
Test at 125% of rated capacity (25 tons).
Verify structural integrity and deflection.
Dynamic Load Test
Test at 110% of rated capacity (22 tons).
Evaluate operational performance.
Safety Function Testing
Overload protection.
Limit switches.
Emergency stop functions.
Braking system performance.
13. Packing and Shipment
Component Protection
Protect machined surfaces.
Secure electrical components.
Wrap sensitive equipment.
Export Packing
Steel structure packing.
Wooden cases for electrical parts and accessories.
Container loading preparation.
Shipping Documentation
Packing list.
Inspection reports.
Operation and maintenance manuals.
Quality certificates.
14. Site Installation and Commissioning
Installation
Runway inspection.
Crane erection.
Hoist installation.
Electrical connections.
Commissioning
System adjustment.
Operational testing.
Load testing.
Final Acceptance
Customer inspection.
Performance verification.
Operator training.
Project handover.
4. Main Girder Fabrication
The girder is assembled and welded into a box structure.
Process
Plate positioning
Tack welding
Automatic submerged arc welding
Reinforcement installation
Camber control
Key Requirements
Dimensional accuracy
Welding quality
Deflection control
5. End Carriage Manufacturing
End carriages are fabricated and assembled separately.
Components
Wheel blocks
Bearing housings
Drive shafts
Motor seats
Processes
Welding
Machining
Assembly alignment
6. Machining Process
Critical components are precision machined.
Machined Parts
Wheel assemblies
Bearing seats
Couplings
Gearbox interfaces
Equipment
CNC milling machines
Boring machines
Lathes
7. Welding Inspection & NDT
Weld quality inspection ensures structural safety.
Inspection Methods
Visual inspection
Ultrasonic testing (UT)
Magnetic particle testing (MT)
Dimensional inspection
Objectives
Detect welding defects
Ensure structural integrity
9. Electrical System Installation
Main Components
Control cabinet
Frequency inverters (VFD)
Contactors and relays
Limit switches
Power supply system
Wiring
Cable routing
Terminal connections
Grounding installation
10. Complete Crane Assembly
Mechanical Assembly
Main girder and end carriage connection
Trolley installation
Hoist installation
Wheel alignment
Electrical Assembly
Power system connection
Control system integration
Safety device installation
11. Quality Inspection and Testing
Dimensional Inspection
Span verification
Camber measurement
Assembly accuracy inspection
Electrical Inspection
Insulation resistance test
Continuity test
Grounding verification
Mechanical Inspection
Wheel alignment check
Brake performance test
Drive system inspection
12. Functional Testing
No-Load Test
Hoist operation
Trolley travel
Crane travel
Control functions
Safety Device Test
Emergency stop
Limit switches
Overload limiter
Protection systems
13. Load Testing
Static Load Test
125% of rated load
Load held for specified duration
Structural deformation inspection
Dynamic Load Test
110% of rated load
Lifting and traveling operations
Performance verification
14. Final Inspection and Certification
Complete quality audit
Test report preparation
Inspection certificate issuance
Customer witness inspection (if required)
15. Packaging and Delivery
Packaging
Hoist protection wrapping
Electrical component protection
Rust prevention treatment
Shipping Preparation
Component marking
Packing list preparation
Loading into containers or trucks
Export documentation preparation

Workshop view:
The company has installed an intelligent equipment management platform, and has installed 310 sets (sets) of handling and welding robots. After the completion of the plan, there will be more than 500 sets (sets), and the equipment networking rate will reach 95%. 32 welding lines have been put into use, 50 are planned to be installed, and the automation rate of the entire product line has reached 85%.





Hot Tags: 20 ton electric single girder overhead crane for indoor workshop, China 20 ton electric single girder overhead crane for indoor workshop manufacturers, suppliers, factory
You Might Also Like
Send Inquiry




























