300 Tons Double Beam Gantry Crane For Bridge Construction
Product Introduction
300 Tons Double Beam Gantry Crane for Bridge Construction – Introduction
A 300-ton double beam gantry crane is a heavy-duty lifting system designed specifically for large-scale bridge construction, precast beam handling, segment erection, and heavy structural lifting. With its high load capacity, stable double-girder structure, and customizable span, it ensures safe and efficient handling of oversized concrete beams, steel structures, and prefabricated components. It is widely used in highway bridges, railway bridges, high-speed rail projects, and large infrastructure construction.
Main Components
1. Double Girder Main Beam
High-strength welded steel structure
Large section design for maximum rigidity
Equipped with maintenance walkway and railings
2. Heavy-Duty Trolley & Hoisting Mechanism
Twin-hoist or synchronized hoisting system
High-power motors and hardened gear reducers
Precise lifting control for long precast beams or segments
3. Gantry Legs (A-frame or U-type)
Robust, box-type fabricated legs
Designed for heavy vertical loads and outdoor working conditions
4. Travel Mechanisms
Crane travel: motor-driven bogies with multi-wheel configuration
Trolley travel: variable frequency drive (VFD) for smooth, accurate positioning
5. Electrical System
PLC control system
Overload protection, emergency stop, limit switches
Optional remote control and monitoring system
6. Power Supply System
Cable reel or bus-bar power supply
Weatherproof design for outdoor construction sites
7. Safety Protection Devices
Anti-collision sensors
Windproof rail clamps & storm brakes
Overload limiter, overspeed protection, emergency stop
Advantages
1. Ultra-High Lifting Capacity (300 Tons)
Designed for heavy precast beams, steel bridge girders, and oversized components used in modern bridge projects.
2. Rigid Double-Girder Structure
Provides excellent stability and low deflection, ensuring safe lifting of long or asymmetric loads.
3. Synchronized Operation
Twin hoists or dual-trolley systems can synchronize for precise beam placement and segment positioning.
4. High Efficiency for Bridge Construction
Reduces installation time and labor costs by handling large components quickly and safely.
5. Adaptable Design
Adjustable span and height options
Customizable hoisting speed and configuration to match project requirements.
6. Reliable Outdoor Performance
Windproof design, corrosion-resistant materials, and weather-protected electrical components.
7. Enhanced Safety
Multiple redundant safety systems comply with international standards such as ISO, CE, and FEM.
Applications
Highway & railway bridge construction
Precast concrete beam lifting (U-beams, T-beams, I-beams, box girders)
Steel structure bridge erection
High-speed rail bridge segment assembly
Large infrastructure construction projects
Heavy industrial lifting operations
Rated Loading Capacity:5 ton, 10 TON, 100 ton, customized, 16/3.2 ton, 20/5 ton, 32/5 ton, 50/10 ton
Max. Lifting Height:40m, customized
Span:35m or clients' demands
Warranty:1 Year
Weight (KG):20000 kg
Core Components:PLC, Engine, Bearing, Gearbox, Motor, Pressure vessel, Gear, Pump
Control way:Cab, wireless remote control or customized

Pictures & Components
Primary Role in Bridge Construction
This crane is used for lifting, moving, and precisely placing massive, pre-fabricated components. Typical lifts include:
Precast Concrete Segments: For segmental balanced cantilever construction.
Full-Span Precast Girders: Placing large I-beams, U-beams, or box girders onto piers.
Steel Trusses and Girders: Erecting large steel framework sections.
Pier Caps and Formwork: Lifting heavy reinforcement cages and formwork for piers.
Launching Gantries & Other Equipment: Assembling and moving the construction equipment itself.
.
Typical Configurations for Bridge Sites
Lifting Mechanism: Often uses two main hoists (e.g., 150 tons each) on a single trolley for balanced lifting, or a single 300-ton hoist.
Travel: The entire gantry moves on fixed steel rails along the construction line. The trolley moves laterally across the bridge width, and the hoist moves vertically.
Power Supply: Usually electrified via a cable reel system or slip ring system along the travel rail.
Control: Operator cabin suspended from the crane or remote radio control for optimal visibility and safety.

3.End carriage
1.The end carriage of an industrial gantry crane is a critical component that connects the crane to the runway beam or rail on which it travels.
2.Here are the key features and functions of the end carriage:
Structure and Functionality
Rollers or Wheels: The end carriage typically has several rollers or wheels that ride along the top of the runway beam or rail. These are designed to minimize friction and allow for smooth movement of the crane.
Bearings and Axles: To support the weight and movement, the rollers or wheels are mounted on axles with bearings that ensure they can rotate freely without excessive wear.
Locking Mechanism: Some end carriages may include locking mechanisms that can secure the crane in a fixed position when not in use or during maintenance.
Adjustment Mechanisms: There may be adjustment mechanisms to fine-tune the alignment and ensure that the crane moves straight along the runway beam without deviation.
3.The end carriage is vital for the stable and reliable operation of the gantry crane. It ensures that the crane can move smoothly and efficiently along the runway beam, carrying out its hoisting and transporting functions with precision. Proper maintenance and inspection of the end carriage are crucial to prevent issues that could affect the crane's performance or lead to safety hazards.

4.Crane travelling mechanism
1.The crane traveling mechanism of an industrial gantry crane is responsible for moving the crane horizontally along its runway beams or rails. This mechanism allows the crane to transport loads over a larger area, making it extremely useful in warehouses, shipyards, and other industrial environments where heavy items need to be moved around a broad expanse.
2.Here are the key components and features of the crane traveling mechanism:
Components of the Traveling Mechanism
Drive Units (Traction Units): These are typically electric motors that provide the power to move the crane. The number of drive units can vary depending on the size and capacity of the crane; some cranes may have multiple motors for each side to distribute the load.
Gearboxes: Gearboxes are used to reduce the high speed of the motor to a lower speed suitable for the crane's travel. They also increase the torque output, which is necessary to move the crane and its load.
Wheels or Rollers: Large wheels or rollers are mounted on axles and are driven by the motor through the gearbox. These wheels or rollers ride along the top of the runway beams or rails and are crucial for stable movement.
3.The traveling mechanism is one of the most critical components of an industrial gantry crane, as it determines the crane's mobility and range of operation. Proper maintenance and regular inspections are crucial to ensure that the traveling mechanism operates smoothly and safely. Any issues with this mechanism can significantly impact the crane's performance and safety, making it vital to address any problems promptly.
5.Trolley travelling mechanism
1.The trolley traveling mechanism of an industrial gantry crane is responsible for moving the hoist or lifting mechanism horizontally along the crane's main beam or gantry. This allows the crane to position the load precisely in the transverse direction.
2.The trolley traveling mechanism consists of several key components:
Components of the Trolley Traveling Mechanism
Drive Unit: Typically an electric motor, the drive unit provides the power to move the trolley. The size and capacity of the motor depend on the crane's lifting capacity and the required speed of the trolley.
Gearbox: The gearbox reduces the high speed of the motor output to a lower speed suitable for the trolley's travel. It also increases the torque, which is necessary to move the hoist mechanism and any attached load.
Wheels or Rollers: The trolley rides on wheels or rollers that are mounted on axles. These wheels or rollers travel along the flanges or tracks on the main beam, allowing the trolley to move back and forth.
Brake System: A braking system is integrated into the trolley to control its movement and to hold it in position when needed. This can be a mechanical brake, an electromechanical brake, or a dynamic braking system.
3.The trolley traveling mechanism is crucial for precise positioning of the load in the transverse direction. It allows the crane to place loads accurately at different points along the length of the gantry. Proper maintenance and regular inspections are essential to ensure that the trolley mechanism operates smoothly and safely. Any issues with this mechanism can significantly impact the crane's operational efficiency and safety, making it vital to address any problems promptly.
6.Crane wheel
1.The crane wheel of an industrial gantry crane is a critical component that allows the crane to move along its runway beams or rails. These wheels are designed to support the weight of the crane, its load, and any additional dynamic forces generated during operation.
2.Here are the key features and functions of crane wheels:
Features of Crane Wheels
Material: Crane wheels are typically made from high-strength materials such as steel or cast iron to ensure they can withstand the heavy loads and stresses involved in lifting operations.
Size and Configuration: The size of the wheels varies depending on the capacity and design of the crane. They can be larger for heavier cranes to distribute the load more evenly. The number of wheels per axle and the number of axles per crane can also vary based on design requirements.
3.Crane wheels play a vital role in the mobility and stability of industrial gantry cranes. They are responsible for transferring the weight of the crane and its load to the runway beams or rails while allowing for smooth travel. The durability and efficiency of the crane's movement largely depend on the quality and condition of these wheels.
4.Proper maintenance of crane wheels, including regular inspections and timely replacement of worn components, is crucial for the safe and reliable operation of the crane. Neglecting wheel maintenance can lead to increased downtime, reduced efficiency, and potential safety hazards.
![]() |
![]() |
![]() |
7.Crane Hook
1.The crane hook of an industrial gantry crane is a critical component that allows the crane to lift and move various loads. The hook is the point of contact between the crane's hoisting mechanism and the load, making it a crucial interface for safe and efficient operations.
2.Here are the key features and functions of crane hooks:
Features of Crane Hooks
Material: Crane hooks are typically made from high-strength steel or alloy steel to ensure they can withstand the heavy loads involved in lifting operations. The material is chosen for its durability and resistance to wear and tear
Design: The design of the hook includes an opening at the top where it attaches to the hoist rope, chain, or other lifting device. The bottom part of the hook has a curved shape that allows it to securely engage with lifting points on the load.
Safety Latch: Many hooks are equipped with a safety latch or locking mechanism to prevent the load from accidentally slipping off. This latch must be manually opened to release the load at the desired location.
Load Ratings: Each hook is rated for specific maximum loads, and it is essential to use hooks that are rated for the intended loads to ensure safety and compliance with regulations.
![]() |
![]() |
![]() |
Motor
The motor of an industrial gantry crane is a critical component that provides the power necessary for lifting and moving loads. Motors in gantry cranes are typically electric and can be categorized into two main types based on their function: the hoisting motor and the travelling (or traversing) motor.
The hoisting motor is responsible for lifting and lowering the hook or grab that engages with the load. This motor's primary function is to control the vertical movement of the crane's loading mechanism.
Crane motors are the powerhouse of industrial gantry cranes, providing the energy required for both lifting and moving operations. The performance, reliability, and safety of the crane are heavily dependent on the motors' efficiency and durability. Proper selection, maintenance, and regular inspections of these motors are crucial for ensuring the crane operates smoothly and safely. Any issues with the motors can lead to operational inefficiencies, increased downtime, and potential safety risks, making prompt attention to motor problems essential.

.
Sound and light alarm system & limit switch
1.Industrial gantry cranes are equipped with a sound and light alarm system and limit switches to enhance safety and operational efficiency. These components play crucial roles in preventing accidents and ensuring that the crane operates within its designated parameters.
2.Sound and Light Alarm System
The sound and light alarm system is designed to alert personnel in the vicinity of the crane about its operational status. This system is particularly important in environments where the crane operates in close proximity to workers or where visibility is limited.
3.Limit Switches
Limit switches are electronic devices that serve as critical safety features on industrial gantry cranes. They detect the position of the crane or its components and cut off power when the crane reaches its operational limits, preventing potential accidents and damage.
4.Both the sound and light alarm system and limit switches are integral to the safe operation of industrial gantry cranes. The alarm system ensures that personnel are aware of the crane's movements and operational status, reducing the risk of collisions or other hazards. Limit switches, on the other hand, automate safety by physically preventing the crane from operating beyond its design limits. Together, these systems contribute to a safer workplace and protect both the crane equipment and the personnel working around it. Proper maintenance and regular testing of these systems are essential to ensure they function reliably and effectively.

10.Safety Devices
Overload Protection Devices
Overload protection devices are designed to prevent the crane from operating beyond its safe working load limits. These devices monitor the load being lifted and will either send an alert or shut down the crane if the load exceeds the specified limit. This is crucial for preventing structural damage to the crane and avoiding accidents that can occur due to overloading.
Limit Switches
As mentioned earlier, limit switches automatically stop the crane when it approaches the end of its travel range or when any of its components reach their operational limits. These switches are essential for preventing the crane from exceeding its physical boundaries, which could result in damage to the structure or collision with obstacles.
Anti-Collison Devices
Anti-collison devices are particularly important in environments where multiple cranes operate in close proximity or where there is significant ground traffic. These devices use sensors, cameras, or other technologies to detect the presence of other objects in the crane's path and either alert the operator or automatically halt the crane's movement to prevent a collision.
Emergency Stop Buttons
Emergency stop buttons are manually operated controls that allow the crane operator or any authorized personnel to immediately stop all crane operations in case of an emergency. These buttons are strategically placed within easy reach of the operator and are often red and highly visible.
Brake Systems
Brake systems on industrial gantry cranes are designed to hold the load securely in place when not in motion and to provide controlled stopping during operations. These brakes can be mechanical, electrical, or a combination of both, and they are critical for preventing unexpected load movements that could lead to accidents.
Levelness Indicators
Levelness indicators are used to ensure that the crane is level during operation, especially when lifting precise or delicate loads. Uneven lifting can cause loads to shift, potentially leading to loss of control and accidents. These indicators help operators maintain the crane's balance and stability.
Safe Working Load Indicators
Safe working load indicators clearly mark the maximum safe load capacity for the crane. This information is vital for operators to ensure that the crane is not overloaded and operates within its design specifications.
11.Control Mode
1.Manual Control
Direct Intervention: The crane operator directly controls the hoisting and traveling movements of the crane using handwheels, levers, or push buttons. This mode requires skilled operators who can manually synchronize the movements to achieve the desired positioning of the load.
Simple Mechanisms: Manual control systems are generally simpler in design and may be less prone to complex failures.
Limited Precision: The precision of the crane's movements is limited to the operator's skill and experience.
2.Semi-Automatic Control
Assisted Operation: The crane operator uses control devices such as joysticks or paddle switches to command the crane, but the system includes automated features that assist in controlling speed and synchronization.
Enhanced Safety: Semi-automatic systems often include safety features like automatic stops at load limits or travel limits.
Improved Efficiency: These systems can improve operational efficiency by reducing the need for highly skilled operators.
3.Fully Automatic Control
Programmable Logic Controller (PLC): The crane's operations are governed by a PLC, which can be programmed to perform specific sequences of operations automatically.
Precise Control: Fully automatic systems offer precise control over the crane's movements, allowing for complex maneuvers to be executed consistently.
Reduced Human Error: Automated systems reduce the potential for human error, enhancing safety and reliability.
Remote Operation: In some cases, fully automatic cranes can be operated remotely, removing the operator from potentially hazardous environments.
4.Radio Control
Wireless Operation: The crane operator uses radio transmitters to control the crane from a distance, which can be particularly useful in environments where visual contact with the crane is limited.
Increased Flexibility: Radio control allows operators to move freely around the work area while maintaining control of the crane.
Safety Considerations: Proper frequency management and security measures must be in place to prevent interference or unauthorized operation of the crane.
5.Computer Control
Advanced Systems: Some gantry cranes may employ computer systems that integrate advanced features such as machine vision, artificial intelligence, and data analysis to optimize operations.
Data Collection: Computer-controlled cranes can collect operational data, which can be used for maintenance planning and operational optimization.
Interface Options: Operators may interact with the crane through touch screens or other advanced interfaces, providing detailed feedback and control options.

12.Sketch

Main technical

Advantages
1. Unmatched Lifting Capacity with Precision
Core Advantage: The 300-ton capacity handles the heaviest bridge components (massive precast girders, pier segments, steel trusses) in a single lift. The double beam design provides the structural rigidity needed to handle these loads without excessive deflection, allowing for millimeter-accurate placement.
Bridge Benefit: Enables the use of larger, pre-fabricated components. This shifts work from hazardous, time-consuming onsite casting to controlled factory settings, improving quality and safety.
2. Complete Coverage of the Construction Line
Core Advantage: The crane runs on fixed rails that parallel the bridge alignment. It can service the entire length of its track-covering staging areas, storage yards, and the construction footprint itself.
Bridge Benefit: Creates a seamless, in-line workflow. Components can be unloaded from barges or trucks at one point, stored, and then lifted directly into their final position without needing intermediate transfer. This optimizes site logistics in tight corridors (e.g., over water or existing roads).
3. Superior Stability and Safety for Critical Lifts
Core Advantage: The wide leg span and rail-mounted system provide an extremely stable lifting base. It is far less susceptible to ground settlement issues that affect crawler cranes and is designed for high wind conditions common on open bridge sites.
Bridge Benefit: Allows work to continue in weather that would ground mobile cranes. Most critically, it provides the confidence to make slow, controlled lifts over expensive existing infrastructure or water, minimizing risk.
4. Dedicated, Unobstructed Work Path
Core Advantage: The crane operates over the work area, not within it. It doesn't compete with truck traffic, concrete pumps, and workers for space on the ground level or on the deck.
Bridge Benefit: Dramatically improves site safety and efficiency. Other critical path activities can continue uninterrupted underneath the crane's span while it is lifting or traveling.
5. High Productivity for Repetitive Tasks
Core Advantage: Once set up, the crane offers a fast, predictable cycle time for repetitive lifts. Operations are simplified: lift, traverse, lower. No continuous rigging and setup are required for each new position as with a mobile crane.
Bridge Benefit: Ideal for projects with many identical components (e.g., placing 50 consecutive girders). It leads to a steady, reliable construction pace, crucial for meeting tight schedules.
6. Economic Efficiency on Large Linear Projects
Core Advantage: While the initial capital investment and setup time are high, the operational cost per lift becomes very low over the lifespan of a long project. It requires a smaller crew to operate than managing multiple mobile cranes.
Bridge Benefit: For a bridge spanning several kilometers, this crane becomes the most cost-effective solution. It eliminates the need to repeatedly mobilize, demobilize, and reposition large mobile cranes, which is extremely time-consuming and expensive.
7. Flexibility in Configuration
Core Advantage: It can be customized for the specific project:
Span: Can be designed to straddle the entire bridge width, including piers and temporary works.
Lifting Height: Tailored for high piers or elevated roadways.
Optional Features: Can be equipped with rotating hooks, lifting beams for segmented decks, or even a "lifting frame" to handle entire pier tables.
Bridge Benefit: Becomes a bespoke tool for the project's unique geometry, rather than a compromise.
Application:
Excellent. The application of a 300-ton double beam gantry crane in bridge construction is highly specialized, targeting specific construction methods and heavy components. Its role is integral, acting as the primary material handling system for critical path activities.
Here is a detailed breakdown of its core applications, categorized by construction method and component type.
1. Application by Bridge Construction Method
A. Precast Segmental Construction (Balanced Cantilever)
Primary Task: Lifting and placing precast concrete segments from the ground or a barge onto the advancing bridge deck.
How it's Used:
Segments (typically 50-150 tons each) are delivered and stored under the crane's coverage area.
The crane lifts a segment, travels along its rails to the tip of the cantilever.
Using precision controls, it places the segment for epoxy bonding and post-tensioning.
Advantage Over Launching Gantry: The ground-based gantry can service multiple piers simultaneously and is not dependent on the deck strength during early stages.
B. Precast Girder Erection (The Most Common Application)
Primary Task: Installing long-span prestressed concrete I-girders, U-beams, or box girders onto abutments and piers.
How it's Used:
Girders are transported on Self-Propelled Modular Transporters (SPMTs) and positioned beneath the crane.
The crane uses a spreader beam or lifting frames to pick up the girder at its designated lifting points.
It travels along the bridge alignment and precisely lowers the girder onto the bearing pads.
Key Benefit: Enables rapid, assembly-line-style erection of superstructure elements, dramatically accelerating project timelines.
C. Steel Bridge Erection
Primary Task: Handling large steel girders, trusses, and arch sections.
How it's Used:
Large steel components are assembled in a nearby staging yard under the crane.
The crane lifts complete sections, often weighing 200-300 tons, and places them onto piers or temporary supports.
It holds sections in place for bolting or welding.
Key Benefit: The double beam's rigidity prevents sway, allowing for perfect alignment of bolt holes in steel members.
D. Incremental Launching Method Support
Primary Task: Assembling the launchable bridge deck segments behind the abutment.
How it's Used: The crane operates in a dedicated "casting yard" area, lifting formwork, rebar cages, and concrete buckets to construct each segment of the deck that will be pushed forward. It is the workhorse for building the product that the launching nose pushes out.
2. Application by Specific Component Lifted
| Component | Weight Range | Application Detail |
|---|---|---|
| Precast Concrete Girders | 80 - 300 tons | The core application. Lifted from transporters and set on piers. |
| Precast Deck Segments | 50 - 150 tons | For segmental bridges, placed on cantilevers or falsework. |
| Full Pier Caps/Crossheads | 150 - 250 tons | Lifting massive pre-cast or cast-in-situ pier caps into position. |
| Heavy Formwork & Falsework | 20 - 100 tons | Handling large custom formwork systems for piers and pylons. |
| Reinforcement Cage Assemblies | 10 - 50 tons | Placing large, pre-tied rebar cages for piers or piles. |
| Steel Box Girders | 100 - 300 tons | Erecting main longitudinal steel members. |
| Construction Equipment | Varies | Assembling and positioning other cranes, pile rigs, and launching gantries. |
3. Phased Application on a Typical Bridge Site
Phase 1: Substructure (Piers & Abutments)
Application: Lifting cofferdam sections, pile casing, rebar cages, and pier formwork. The crane's ability to reach along the entire pier line streamlines this foundation work.
Phase 2: Superstructure Erection (The Crane's Peak Usage)
Application: As described above-this is the crane's primary purpose. It is in constant use placing girders or segments.
Phase 3: Deck Finishing & Equipment Removal
Application: Placing barrier rail panels, service ducts, and even small batch concrete skips. Finally, it assists in dismantling and removing its own components or other site equipment.
4. Real-World Site Configuration & Logistics
Typical Track Layout: Rails are laid parallel to the bridge axis, often on one or both sides of the pier line.
Staging Area Integration: The crane's coverage area is designed to include:
Unloading Zone: Where trucks or barges deliver components.
Storage/Laydown Yard: Where components are staged in order of installation.
Erection Corridor: The direct path from storage to the final position.
Power & Control: Operates via cable reel or conductor bar along the track. Control is from an elevated cabin or via remote radio control for optimal visibility.
Crane production procedure
1. Design and Engineering
Detailed Engineering: Develop detailed engineering drawings and specifications, including the main beam, hoist, trolley, end carriages, and other components.
Simulation and Modeling: Use computer-aided design (CAD) and simulation tools to model the crane's performance and optimize its design.
2. Material Selection
Material Specifications: Select high-quality materials that meet the requirements for strength, durability, and heat resistance. Common materials include high-strength steel, alloys, and specialized coatings.
Procurement: Source materials from approved suppliers, ensuring they meet the necessary quality and certification standards.
3. Component Fabrication
Cutting and Shaping: Cut and shape raw materials into the required components, such as beams, columns, and brackets. This may involve processes like plasma cutting, laser cutting, and machining.Welding and Assembly: Weld components together to form the crane's structural elements. This includes welding the main beam, end carriages, and other load-bearing parts.
4. Assembly
Sub-Assembly: Assemble individual components, such as the hoisting system, trolley, and end carriages, into sub-assemblies. This involves fitting parts together and ensuring proper alignment.Main Assembly: Combine sub-assemblies to construct the complete crane structure. This includes mounting the hoist and trolley on the main beam, attaching the end carriages, and installing the control systems.
5. Integration of Systems
Electrical Systems: Install electrical components, including motors, control panels, wiring, and sensors. Ensure that the crane's electrical systems are properly integrated and tested.
Control Systems: Implement and configure control systems, such as programmable logic controllers (PLCs), remote controls, and safety devices. Verify that the control systems function correctly and are calibrated.
6. Testing and Quality Assurance
Pre-Operational Testing: Conduct pre-operational tests to check the crane's functionality, including load testing, operational testing of the lifting and traveling mechanisms, and control system checks.
Safety Testing: Verify that safety features, such as limit switches, alarms, and emergency stops, are working correctly and meet safety standards.
Inspection: Perform a detailed inspection of the crane's structure and components to ensure compliance with design specifications and quality standards.
7. Final Adjustments and Calibration
Fine-Tuning: Make any necessary adjustments to optimize the crane's performance and ensure smooth operation. This may include calibrating sensors, adjusting controls, and fine-tuning the lifting system.
Documentation: Prepare and review documentation, including operation manuals, maintenance guides, and safety instructions.
8. Delivery and Installation
Transport: Arrange for the transport of the crane to the installation site, ensuring that it is handled and shipped safely to prevent damage.
Installation: Oversee the installation of the crane at the customer's facility, including assembly, alignment, and connection to power sources and control systems.
Training: Provide training for operators and maintenance personnel to ensure they are familiar with the crane's operation and safety procedures.
9. Commissioning and Handover
Commissioning: Conduct final commissioning tests to verify that the crane operates correctly under real-world conditions and meets performance specifications.
Handover: Officially hand over the crane to the customer, providing all necessary documentation, including certificates of compliance, warranty information, and maintenance schedules.

Workshop view
Material Inspection
Quality Inspection: Strict quality inspection is carried out on the purchased raw materials to ensure that they meet the design requirements and national standards.
Material Storage: Qualified materials are stored according to classification to prevent corrosion or damage.
Cutting and Forming
Steel Cutting: Use plasma cutting, laser cutting or flame cutting and other technologies to cut the steel according to the size of the design drawing.
Forming Processing: Form the steel plate through bending, rolling, welding and other processes to manufacture the main beam, end beam and other structural parts.
Welding
Component Welding: The cut and formed steel parts are welded into the main structures such as the main beam, end beam and trolley. The welding process needs to be strictly controlled to ensure the structural strength and welding quality.
Weld Inspection: Use non-destructive testing technology (such as ultrasonic testing, radiographic testing) to inspect the welds to ensure that there are no cracks or other defects.
Machining
Precision Machining: Precision machining is performed on the key components of the crane, such as wheel sets, bearing seats, pulleys, etc., to ensure their dimensional accuracy and surface quality.
Assembly of the whole machine
General assembly: On the basis of pre-assembly, the overall assembly of the crane is carried out, including the final installation of the main beam, end beam, lifting mechanism, walking mechanism, etc.
Commissioning and testing
Under dynamic conditions, the operating performance of the crane is tested, including the testing of lifting, walking, steering and other functions. The overall size of the assembled bridge crane is checked to ensure that all dimensions meet the design requirements.
Spraying and anti-corrosion treatment
Surface treatment Rust removal: Rust removal on the surface of the crane, common methods include sandblasting, pickling, etc. Primer spraying: Spray anti-corrosion primer on the treated surface to prevent metal oxidation and corrosion. Topcoat spraying Color spraying: Spray topcoat according to customer requirements or industry standards to give the crane a protective and decorative effect. Marking: After spraying, mark the crane's identification information in accordance with the specifications, such as model, rated load, etc.
Factory and installation
Packaging and transportation
Packaging protection: Protectively package the key components of the crane to prevent damage during transportation. Transportation arrangement: According to the equipment size and transportation conditions, select a suitable transportation method to transport the crane to the customer's site.
Acceptance and delivery
Customer acceptance
On-site acceptance: The customer conducts on-site acceptance of the crane according to the contract requirements and technical specifications to check the performance and quality of the equipment.
Problem rectification: If any problems are found, the manufacturer needs to rectify them in time to ensure that the equipment fully meets the customer's requirements. Delivery and use Operation training: The manufacturer usually trains the customer's operators to ensure that they can operate the crane correctly and safely.





Hot Tags: 300 tons double beam gantry crane for bridge construction, China 300 tons double beam gantry crane for bridge construction manufacturers, suppliers, factory
You Might Also Like
Send Inquiry