We designed a 20 ton steel plant maintenance overhead crane system for heavy equipment repair and maintenance.
The project required two double girder EOT cranes with open winches.
The cranes operate in a demanding steelmaking environment with:
Ambient temperature up to 65°C
Fine iron dust
Relative humidity up to 95%
Frequent crane starts
36 m hook stroke
55 m travelling course
To match these conditions, the reference design uses A5 crane structure classification, M5 hoist and trolley mechanisms, IP65 Class H motors, IC411 cooling, PTC temperature protection, 40% ED and up to 100 starts/hour.

Project Data
| Item | Reference Specification |
|---|---|
| Application | Steel plant equipment maintenance |
| Crane capacity | 20 ton |
| Quantity | 2 sets |
| Crane type | Double girder EOT crane |
| Hoisting system | Open winch |
| Hook stroke | 36 m |
| Travelling course | 55 m |
| Crane structure | A5 |
| Hoist & trolley mechanism | M5 |
| Control | Radio remote control |
| Ambient temperature | Up to 65°C |
| Humidity | Up to 95% |
| Working environment | Fine iron dust |
| Motor protection | IP65 |
| Motor insulation | Class H |
| Motor cooling | IC411 |
| Motor protection | PTC |
| Duty cycle | 40% ED |
| Starting frequency | Up to 100 starts/hour |
Customer Requirement: A Crane for Steel Plant Maintenance
This crane is used for maintenance work inside a steelmaking plant.
The lifting requirement is different from a normal fabrication workshop.
The maintenance team may need to remove a motor from its foundation, lift a gearbox, replace a pump or move a heavy mechanical assembly during a shutdown.
Typical maintenance loads include:
Electric motors
Gearboxes
Pumps
Valves
Mechanical assemblies
Replacement components
Maintenance tools
Lifting fixtures
The project required:
2 × 20 ton double girder EOT cranes
The rated capacity is 20 ton. For a similar project, the buyer should also confirm the actual weight of the heaviest component, including lifting beams, spreaders or other attachments where applicable.
The Site Conditions Changed the Crane Design
The most important part of this project was not the 20 ton capacity.
It was the working environment.
The reference conditions included:
65°C maximum specified ambient temperature
Fine iron dust
95% relative humidity
Frequent starts and stops
Long lifting stroke
Regular maintenance requirements
These conditions directly affect the selection of motors, electrical equipment, cooling, insulation, protection devices and maintenance access.
A crane designed for a normal indoor workshop should not automatically be transferred into a steelmaking area without reviewing these conditions.
Four Engineering Issues Had to Solve
High Temperature - Up to 65°C
At 65°C, motor thermal performance becomes an important design input.
Our engineering review needs to consider:
Motor insulation
Motor temperature rise
Cooling capacity
Brake performance
Electrical components
Cable insulation
Lubrication requirements
Control cabinet operating conditions
The reference design uses Class H motor insulation and IC411 cooling.
The motor selection still needs to be checked against the actual load and duty cycle.
Fine Iron Dust
Fine metallic dust can increase contamination and maintenance requirements.
The reference crane uses IP65 motors.
For the complete crane, engineers should also review:
Electrical enclosures
Cable entries
Limit switches
Sensors
Control components
Motor cooling surfaces
Inspection points
IP65 on the motor does not mean every electrical component on the crane automatically has the same protection level. Each component should be specified according to its location and function.
Frequent Starts and Stops
Maintenance work is usually intermittent.
The crane may repeatedly:
lift → travel → stop → position → lower → release → lift again.
The reference project specifies:
40% ED
Up to 100 starts/hour
M5 hoist mechanism
M5 trolley mechanism
A5 crane structure classification
This gives the engineering team a basis for checking motor heating, brake operation, gearbox loading and mechanism selection.
36 m Hook Stroke
A 36 m hook stroke is another major design input.
It affects:
Wire rope length
Rope drum capacity
Rope reeving
Sheave arrangement
Hook block
Brake selection
Upper/lower limit protection
Additional hoisting-path protection
The project also specifies rotary and counterweight limit devices for additional hoisting protection.
Solution
20 Ton Double Girder EOT Crane + Open Winch
The configuration provides a suitable bridge arrangement for the required lifting capacity, long hook stroke, duty and maintenance access.
Engineering Configuration
| Requirement | Our Design Response |
|---|---|
| 20 ton maintenance load | Double girder EOT crane |
| Long 36 m hook stroke | Open winch + engineered rope system |
| Frequent operation | A5 / M5 mechanism classification |
| 65°C environment | Class H motor + thermal review |
| Fine iron dust | IP65 motors |
| Frequent starts | 40% ED + up to 100 starts/hour |
| Motor temperature monitoring | PTC |
| Long travelling course | 55 m travel + travel protection |
| Operator mobility | Radio remote control |
| Crane servicing | Walkways, platforms and access provisions |
This is the key part of the our company approach:
Site conditions are converted into engineering requirements before the final crane configuration is fixed.
Motor Protection: Why These Specifications Matter
IP65 Motor Protection
The reference design uses IP65 motors.
This provides protection against dust ingress and water jets.
It is relevant to steel plant areas where fine dust is present.
The complete electrical system still needs to be reviewed according to the actual installation location.
Class H Motor Insulation
The motors use Class H insulation.
This provides a higher thermal insulation class for the motor winding system.
For a specified ambient temperature of up to 65°C, motor thermal conditions need to be reviewed carefully.
The insulation class should be considered together with:
Motor temperature rise
Duty cycle
Load
Starting frequency
Cooling method
Ambient temperature
IC411 Cooling
The reference motor uses IC411 cooling.
This is a totally enclosed, fan-cooled motor arrangement.
For high-temperature applications, the cooling system must be checked against the motor's actual operating load and ambient temperature.
PTC Temperature Protection
PTC thermistors monitor motor winding temperature.
This gives the control system an additional way to detect excessive motor temperature.
It is particularly useful when the crane has:
High ambient temperature
Frequent starts
Repeated lifting cycles
Duty Class: A5 and M5 Are Not Just Numbers
The project specifies:
A5 crane structure classification
M5 hoist mechanism
M5 trolley mechanism
40% ED
Up to 100 starts/hour
These parameters describe how the crane is expected to work.
For buyers, the important question is not simply:
"Is M5 a heavy-duty crane?"
The better question is:
"Does M5 match my actual operating cycle?"
When requesting a quotation, provide:
Working hours per day
Working days per year
Average load
Maximum load
Lifting frequency
Travel frequency
Starts per hour
Expected service life
If the duty classification is unknown, the actual work cycle can be provided to the crane manufacturer for engineering review.
Maintenance Access Was Designed Into the Maintanance Overhead Crane
A steel plant maintenance crane has a special requirement:
The crane itself must be easy to inspect and service.
The reference design includes provisions for:
Full-length walkway
Anti-slip flooring
Handrails
Maintenance platforms
Access ladders
Stairs
Inspection covers
Motor access
Gearbox access
Brake inspection
Rope inspection
Wheel inspection and replacement
Maintenance lifting points
The buyer should check access to every component that may require service.
This includes the:
motor, gearbox, brake, rope drum, wire rope, sheaves, wheels, bearings, limit devices and electrical equipment.
A good crane layout should answer a simple question:
When a component needs to be inspected or replaced, can the maintenance technician reach it safely?
10. Safety and Protection Features
The reference design includes several layers of protection.
Overload Protection
A dedicated microprocessor-based overload protection system is specified.
The overload setting is limited to a maximum of 10% above rated load.
When overload is detected, the system is designed to:
Stop upward hoisting
Allow lowering where required
Prevent continued lifting under overload
The final protection logic should follow the approved electrical control design.
Hoisting Limit Protection
The crane uses additional hoisting-path protection with:
Rotary limit device
Counterweight limit device
These devices help control the hook within the permitted lifting range.
Travel Protection
For the 55 m travelling course, travel limit and control arrangements should be incorporated into the final crane design according to the site layout.
What the Buyer Gets From This Engineering Approach
For the customer, the value is straightforward.
The crane is matched to the actual site.
Not just to the 20 ton rated load.
The electrical system is selected around the environment.
65°C, dust and humidity become engineering inputs.
The hoisting system is selected around the lifting height.
The 36 m hook stroke affects the rope and drum arrangement.
The duty is based on the work cycle.
40% ED and 100 starts/hour are evaluated against actual crane operation.
Maintenance is considered before fabrication.
Walkways, platforms and component access are incorporated into the crane layout.
This reduces the risk of discovering access problems after installation.
Buyer Checklist: What to Include in Your RFQ
If you are sourcing a steel plant maintenance overhead crane, send these details to the crane manufacturer.
Lifting Data
Rated capacity
Maximum load
Heaviest maintenance component
Lifting fixtures or spreader weight
Hook stroke / lifting height
Crane Geometry
Crane span
Runway length
Travelling distance
Available headroom
Existing runway rail information
Duty
Working hours/day
Working days/year
Average load
Load spectrum
Lifting frequency
Starts/hour
Required service life
Environment
Maximum temperature
Minimum temperature
Dust type
Humidity
Indoor/outdoor installation
Corrosive atmosphere, if applicable
Electrical and Control
Voltage
Frequency
Phase
Control method
Radio remote requirement
Existing power supply arrangement
Engineering
Required standards
Building drawings
Crane runway drawings
Maintenance access requirements
Inspection requirements
Required documentation
The more complete this information is, the more useful the quotation becomes.
A request saying "20 ton EOT crane for steel plant" gives the manufacturer the capacity.
It does not give enough information to engineer the crane correctly.
FAQ for Steel Plant Maintenance Crane Buyers
What type of overhead crane is suitable for steel plant maintenance?
For heavy maintenance applications, a double girder EOT crane with an open winch can be suitable when the required capacity, lifting height, duty and site conditions support this configuration.
The final selection should be based on the complete operating requirements.
Can a 20 ton crane operate at 65°C?
A 20 ton crane can be engineered for a specified high-temperature environment, but the complete system must be reviewed.
Motor insulation, cooling, brakes, electrical components, cables and lubrication all need to be checked against the actual ambient temperature.
Why use an open winch?
An open winch provides separate motor, gearbox, brake, coupling and rope drum components.
It is useful for cranes requiring long lifting strokes, demanding duty and practical access for maintenance.
Why are IP65 motors specified?
IP65 provides protection against dust ingress and water jets.
It is relevant where fine iron dust is present.
The protection level of other electrical components should be selected according to their actual installation conditions.
What does 40% ED mean?
40% ED refers to the specified motor duty cycle.
It should be evaluated together with load spectrum, operating hours and starts per hour.
Is 100 starts/hour important?
Yes.
Frequent starting increases motor heating and affects the selection of motors, brakes, contactors or drives and the overall duty assessment.
What maintenance access should be included?
The crane should provide safe access to components requiring inspection and service.
Typical provisions include walkways, handrails, platforms, ladders and access to motors, gearboxes, brakes, rope drums, wheels and electrical equipment.