Ship To Shore Container Gantry Crane
video

Ship To Shore Container Gantry Crane

A remote control container gantry crane is a specialized lifting system designed for efficient container handling in ports, logistics yards, and intermodal terminals. Equipped with wireless remote control, it allows operators to manage lifting operations safely and precisely from a distance.
Send Inquiry
Product Introduction

 

Product Introduction

Key Features of STS Gantry Cranes
1. Structural Design

Boom (Outreach Arm) – Extends over the ship (up to 72m+ for Ultra Large Container Ships).
Fixed or luffing (adjustable angle) for flexibility.
Gantry Frame – Steel structure on rails, with legs straddling the quay.
Trolley & Hoist System – Moves along the boom, carrying the spreader.
Spreader – Adjustable twistlock mechanism for 20ft, 40ft, 45ft, and refrigerated containers.
2. Lifting Capacity & Performance
Capacity: 40–100+ tons (some models handle dual-lift operations).
Speed:
Hoisting: 50–90 m/min (empty), 30–60 m/min (loaded).
Trolley travel: 120–240 m/min.
Gantry travel: 30–50 m/min.
Productivity: 25–50+ containers per hour (depends on automation).

3. Movement & Automation
Rail-Mounted Travel System – Moves along the quay for optimal positioning.
Automated Operation (optional):
AI-assisted positioning (laser-guided).
Remote control & autonomous operation (e.g., Rotterdam, Shanghai Yangshan).
Anti-Sway & Collision Avoidance – Ensures safe, precise container handling.

4. Power Supply
Electric (Most Common) – Uses cable reel or conductor bar system.
Diesel-Electric Hybrid – For ports with unstable power supply.
Regenerative Braking – Recovers energy during lowering.

 

Comparison with Alternative Solutions

Feature STS Gantry Crane Mobile Harbor Crane Floating Crane
Max Capacity 100+ tons 200+ tons 1,000+ tons
Containers/Hour 50+ 15–20 5–10
Ship Size Post-Panamax+ Panamax Any
Automation Ready Yes (Level 4) Limited No
Typical Use Case High-volume terminals Multipurpose terminals Heavy-lift projects

 

Rated Loading Capacity:5 ton, 10 TON, 100 ton, customized, 16/3.2 ton, 20/5 ton, 32/5 ton, 50/10 ton

Max. Lifting Height:40m, customized

Span:35m or clients' demands

Warranty:1 Year

Weight (KG):50000 kg

Core Components:PLC, Engine, Bearing, Gearbox, Motor, Pressure vessel, Gear, Pump

Control way:Cab, wireless remote control or customized

 

Rail mounted gantry 12

 

Pictures & Components

1. Main Structural Components
Portal Frame:

Primary supporting structure spanning the quay
Comprises two vertical legs and an upper beam
Designed to withstand dynamic loads up to 100+ tons
Boom System:
Fixed boom: Rigid structure (most common)
Luffing boom: Hydraulically adjustable (for height clearance)
Typical outreach: 40-72m (reaching 24-container rows)
Apex Frame:
Top connection between boom and backreach
Houses trolley rails and hoisting mechanisms

 

product-700-500

 

2. Motion and Drive Systems
Rail Travel Mechanism:

Dual rail system (standard gauge: 30.48m/100ft)
Powered by AC/DC motors (4-16 drive units)
Anti-derailment safety devices
Trolley System:
Cross-beam assembly running on boom rails
Drive: 4-8 motorized wheels with regenerative braking
Speed: Up to 240 m/min (empty), 180 m/min (loaded)
Hoisting Mechanism:
Dual-drum hoists (main + auxiliary)
Wire ropes (typically 28-32mm diameter)
Load capacity: 50-100+ tons under spreader

product-1000-1000 product-1000-1000

3. Container Handling Components
Spreader Assembly:

Types: Fixed, telescopic, rotating
Twistlock mechanisms (ISO standard)
Load cells for weight measurement
Optional features: Auto-latching, reefer plugs
Anti-Sway System:
Electronic load stabilization
Pendulum control algorithms
Laser positioning sensors

product-646-542 product-852-654 product-1030-1030

 

4. Power and Control Systems
Electrical House:

Main transformer (typically 6.6-10kV input)
Variable Frequency Drives (VFDs)
PLC control cabinets (Siemens, ABB, or Schneider)
Operator Cabin:
Ergonomic control station
Multiple HMI screens
360° visibility with camera systems

product-750-580 product-644-643 product-750-580

 

5. Safety Systems
Load Monitoring:

Overload protection (95-110% cutoff)
Load moment indicator (LMI)
Collision Prevention:
Laser scanners (up to 200m range)
Radar-based ship monitoring
Anti-collision software
Environmental Protection:
Wind speed monitoring (cutoff at 20m/s)
Seismic sensors in earthquake zones
Lightning protection system

product-400-172

.product-774-215

6. Auxiliary Systems
Lighting System:

High-mast LED lighting (50,000+ lumens)
Navigation lights (ICAO compliant)
Lubrication System:
Automatic greasing for wire ropes
Centralized lubrication for bearings
Communication Systems:
Fiber optic data transmission
Wireless remote control (optional)

product-879-180

 

product-1345-380

 

SKETCH

product-700-335

 

Main technical

 

product-784-509

 

Advantages

Key Advantages of STS Gantry Cranes

1. Unmatched Productivity
High-Speed Operations: Capable of 30–50+ container moves per hour (single crane), with cycle times as low as 90 seconds per container.
Dual-Lift Capability: Advanced models can handle two 20' containers simultaneously (up to 65 tons total), doubling efficiency.
24/7 Operation: Designed for continuous use in all weather conditions (except extreme winds >20 m/s).

2. Mega-Ship Compatibility
Super-Post-Panamax Reach: Booms extend up to 72m, servicing vessels carrying 24,000+ TEU (e.g., MSC Gülsün-class).
Adaptive Spreader Systems: Automatically adjust for 20', 40', 45', high-cube, and reefers without manual reconfiguration.

3. Precision & Automation
AI-Powered Positioning: Computer vision and LiDAR enable ±5 cm landing accuracy.
Remote Control Centers: Operators can manage cranes miles away via 5G-enabled systems (e.g., Rotterdam's Maasvlakte II).
Automatic Twistlocks: Robotic spreaders reduce human intervention by 40%.

4. Energy Efficiency
Regenerative Braking: Recaptures up to 30% of energy during container lowering.
Eco Modes: Smart power management reduces CO₂ emissions by 15–25% vs. conventional models.

5. Safety Innovations
3D Anti-Collision Systems: Combines radar, lasers, and cameras to prevent accidents with ships/obstacles.
Load Moment Indicators (LMI): Real-time monitoring prevents overloading (Fails at 110% capacity).
Seismic Dampers: Critical for ports in earthquake zones (e.g., Tokyo, Los Angeles).

6. Long-Term Economics
30-Year Lifespan: With proper maintenance, ROI typically achieved in 5–7 years.
Modular Upgrades: Older cranes can retrofit automation systems (50% cheaper than replacement).

Application:

1. Container Terminals
Ultra-Large Vessel Handling: Essential for 18,000+ TEU ships (90% of global trade).
Transshipment Hubs: Rapid transfer between mother ships and feeders (e.g., Singapore, Colombo).
Automated Terminals: Fully integrated with AGVs/ALVs (e.g., Shanghai Yangshan Phase IV).

2. Specialized Cargo
Heavy-Lift Modules: Some models handle project cargo up to 120 tons (oil/gas equipment).
Reefer Management: Dedicated power slots for 400+ refrigerated containers simultaneously.

3. Strategic Infrastructure
Military Logistics: Rapid deployment of containerized equipment (e.g., US Army's Rapid Port Opening).
Disaster Relief: Critical for delivering ISO-standard aid containers post-crisis.

4. Emerging Uses
Offshore Wind Farms: Modified STS cranes install XXL monopiles (new Liebherr HLC variants).
Green Hydrogen Ports: Future-ready for handling liquid hydrogen ISO tanks.

 

Crane production procedure

 

1. Design and Engineering

Detailed Engineering: Develop detailed engineering drawings and specifications, including the main beam, hoist, trolley, end carriages, and other components.

Simulation and Modeling: Use computer-aided design (CAD) and simulation tools to model the crane's performance and optimize its design.

2. Material Selection

Material Specifications: Select high-quality materials that meet the requirements for strength, durability, and heat resistance. Common materials include high-strength steel, alloys, and specialized coatings.

Procurement: Source materials from approved suppliers, ensuring they meet the necessary quality and certification standards.

3. Component Fabrication

Cutting and Shaping: Cut and shape raw materials into the required components, such as beams, columns, and brackets. This may involve processes like plasma cutting, laser cutting, and machining.Welding and Assembly: Weld components together to form the crane's structural elements. This includes welding the main beam, end carriages, and other load-bearing parts.

4. Assembly

Sub-Assembly: Assemble individual components, such as the hoisting system, trolley, and end carriages, into sub-assemblies. This involves fitting parts together and ensuring proper alignment.Main Assembly: Combine sub-assemblies to construct the complete crane structure. This includes mounting the hoist and trolley on the main beam, attaching the end carriages, and installing the control systems.

5. Integration of Systems

Electrical Systems: Install electrical components, including motors, control panels, wiring, and sensors. Ensure that the crane's electrical systems are properly integrated and tested.

Control Systems: Implement and configure control systems, such as programmable logic controllers (PLCs), remote controls, and safety devices. Verify that the control systems function correctly and are calibrated.

6. Testing and Quality Assurance

Pre-Operational Testing: Conduct pre-operational tests to check the crane's functionality, including load testing, operational testing of the lifting and traveling mechanisms, and control system checks.

Safety Testing: Verify that safety features, such as limit switches, alarms, and emergency stops, are working correctly and meet safety standards.

Inspection: Perform a detailed inspection of the crane's structure and components to ensure compliance with design specifications and quality standards.

7. Final Adjustments and Calibration

Fine-Tuning: Make any necessary adjustments to optimize the crane's performance and ensure smooth operation. This may include calibrating sensors, adjusting controls, and fine-tuning the lifting system.

Documentation: Prepare and review documentation, including operation manuals, maintenance guides, and safety instructions.

8. Delivery and Installation

Transport: Arrange for the transport of the crane to the installation site, ensuring that it is handled and shipped safely to prevent damage.

Installation: Oversee the installation of the crane at the customer's facility, including assembly, alignment, and connection to power sources and control systems.

Training: Provide training for operators and maintenance personnel to ensure they are familiar with the crane's operation and safety procedures.

9. Commissioning and Handover

Commissioning: Conduct final commissioning tests to verify that the crane operates correctly under real-world conditions and meets performance specifications.

Handover: Officially hand over the crane to the customer, providing all necessary documentation, including certificates of compliance, warranty information, and maintenance schedules.

 

product-1200-824

 

Workshop view

 

Material Inspection

Quality Inspection: Strict quality inspection is carried out on the purchased raw materials to ensure that they meet the design requirements and national standards.

Material Storage: Qualified materials are stored according to classification to prevent corrosion or damage.

Cutting and Forming

Steel Cutting: Use plasma cutting, laser cutting or flame cutting and other technologies to cut the steel according to the size of the design drawing.

Forming Processing: Form the steel plate through bending, rolling, welding and other processes to manufacture the main beam, end beam and other structural parts.

Welding

Component Welding: The cut and formed steel parts are welded into the main structures such as the main beam, end beam and trolley. The welding process needs to be strictly controlled to ensure the structural strength and welding quality.

Weld Inspection: Use non-destructive testing technology (such as ultrasonic testing, radiographic testing) to inspect the welds to ensure that there are no cracks or other defects.

Machining

Precision Machining: Precision machining is performed on the key components of the crane, such as wheel sets, bearing seats, pulleys, etc., to ensure their dimensional accuracy and surface quality.

Assembly of the whole machine

General assembly: On the basis of pre-assembly, the overall assembly of the crane is carried out, including the final installation of the main beam, end beam, lifting mechanism, walking mechanism, etc.

Commissioning and testing

Under dynamic conditions, the operating performance of the crane is tested, including the testing of lifting, walking, steering and other functions. The overall size of the assembled bridge crane is checked to ensure that all dimensions meet the design requirements.

Spraying and anti-corrosion treatment

Surface treatment Rust removal: Rust removal on the surface of the crane, common methods include sandblasting, pickling, etc. Primer spraying: Spray anti-corrosion primer on the treated surface to prevent metal oxidation and corrosion. Topcoat spraying Color spraying: Spray topcoat according to customer requirements or industry standards to give the crane a protective and decorative effect. Marking: After spraying, mark the crane's identification information in accordance with the specifications, such as model, rated load, etc.

Factory and installation

Packaging and transportation

Packaging protection: Protectively package the key components of the crane to prevent damage during transportation. Transportation arrangement: According to the equipment size and transportation conditions, select a suitable transportation method to transport the crane to the customer's site.

Acceptance and delivery

Customer acceptance

On-site acceptance: The customer conducts on-site acceptance of the crane according to the contract requirements and technical specifications to check the performance and quality of the equipment.

Problem rectification: If any problems are found, the manufacturer needs to rectify them in time to ensure that the equipment fully meets the customer's requirements. Delivery and use Operation training: The manufacturer usually trains the customer's operators to ensure that they can operate the crane correctly and safely.

product-1200-610

product-1099-514

product-1695-676

product-1599-669

product-1269-715

Hot Tags: ship to shore container gantry crane, China ship to shore container gantry crane manufacturers, suppliers, factory

Send Inquiry

whatsapp

Phone

E-mail

Inquiry